Client Problem: 

 

 

 

 A major bearing distributor needed to consolidate and expand existing operations to a new distribution facility.

Applied Handling's Solution

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A design/build contract was secured with this bearing supply company to store 150,000 SKUs.  A wide variety of sizes and weights dictated a design that could safely accommodate the dense storage of unusually heavy commodities.  

A mezzanine/catwalk system designed and installed by Applied Handling incorporated existing shelving materials into the storage system.  A vertical lift was supplied because of space constraints to facilitate the transfer of material to the second level.  Subcontract services included the supply of lighting/electrical and the fire protection system.

 